CURING INSTRUCTIONS:
Thermobond 3 powder coating filler must be cured by heat.
Cure recommendations are as follows:
10 minutes @ 375 degrees F surface temp
07 minutes @ 400 degrees F surface temp
05 minutes @ 425 degrees F surface temp
Longer cure time at lower temperatures is recommended to
allow the metal filler material to adhere properly to
the substrate without blistering.
Thermobond 3 powder coating filler will not air dry.
Please feel free to talk to a technical representative if you
have any questions. 951-245-7778
Order Thermobond 3
